18 MW Mpanga


Design Capacity:  18.0 MW
Average Yearly Output: 68,000 MWh 
Gross Head: 135m
Design Flow: 16 m³/s
Diversion Canal Length: 1,650m
Penstock Length: 103m
Tunnel Length:  103m
Capital Cost: $27.233MM
Acquisition Date: February 2011
Status:  Commercial Operation

See additional photos in the Photo Gallery.