9.2 MW Nyamwamba


Design Capacity:  9.2 MW
Average Yearly Output: 3,900 MWh 
Gross Head: 181m
Design Flow: 6 m³/s
Diversion Canal Length: 1,700m
Penstock Length: 1,600m
Capital Cost: $32.683MM
Scheduled Completion: July 2017